LADENSTEIN ASSEMBLY DIVISION

Once finished the hull lamination, floors and bulkheads will be installed into the hull. In order to avoid any cracks and unwanted movements, Ladenstein use only Fiberglas floors and bulkheads (Plywood floors and bulkheads used by other Shipyards). This superior method gives perfect strength, stability and comfort during your Sea journey.

Hull, Deck and Flying bridge will be set together.

All the floors, bulkheads and the furniture are laminated from both sides to the hull and the deck.